Leonard Smith (top) and Travis Ridgeway (left), install a guy wire to an anchor in the ground to support the tower.
20180720_083646
|
0
Leonard Smith (top) and Travis Ridgeway (left), install a guy wire to an anchor in the ground to support the tower.